Noise reduction during mining excavations for potash extraction

Kunde

Restricted by NDA

Industrie

Mining

Umfang der Arbeiten

Acoustic analysis

Noise strategy

Anti-noise solutions

The problem of noise generated during mining works consists of noise emitted from inside the canal and outside the canal. Interior noise is generated by mining machinery and equipment for coal mining and transportation. Outside noise is generated by the main fans, which must assure a constant, high dedusting efficiency. During this commission, we dealt with lute fans, which were responsible for the emission of noise outside.

The client asked us to propose a noise reduction strategy for the external fans running continuously during potash extraction in the 37 km tunnel. The shaft tower was located 100m below the ground, from which two 1500m deep shafts for the extraction of the polyhalite base were extended. Our task was to silence the lute fans designed to remove dust from the air flowing through them, located at the mine shafts. Due to the large dimensions of the devices, it was necessary to propose a non-standard solution while maintaining the highest acoustic efficiency.

Key value proposition

  1. An unconventional approach to the topic – designing a durable silencer with high acoustic efficiency as well as high aesthetic qualities.
  2. Noise reduction crucial to standards and requirements imposed by the regulations of the country where the machines are working.
  3. Special silencers testing zone with acoustic efficiency measurements - silencers delivered to the test zone in a few phases, revelant fans connected by the client and acoustic efficiency tests perfomed by our specialists.

Dedicated solution

Taking into account the unusual working conditions, care for the mechanical strength of the system, a small space for the silencer and transport possibilities, we had to design a non-standard container silencer with a baffle silencer to increase the acoustic efficiency of the system.

After the acoustic analysis, when materials were selected, it was proposed that we should enclose the noise source in a solid, steel housing with absorbing and reflecting panels. A preliminary concept with overall dimensions, land development and materials used was designed. After the concept got accepted, we produced 16 different container silencers, used in various configurations. We delivered everything to our client’s test zone, where appropriate fans were attached and acoustic tests were performed.

The acoustic efficiency of this design ranged from 28 to 32dBA depending on the selected silencer and fan.

The working team consisted of 1 constructor, 1 junior and 1 senior specialist in acoustics. Tools and technologies used in the project are SketchUp, Autodesk Inventor and AutoCAD.

 

Vollständige Liste der Fallstudien

Effects

  • 7 Designing the silencer for the client: 7 days
  • 10 Production of the silencer: 10 days
  • 3 Total time of the completion – from order to delivery: 3 weeks
  • 5/6 Total duration of the project: 5-6 months

Arbeiten Sie mit uns

Wenn Sie eine bestehende Herausforderung lösen oder eine neue Chance nutzen möchten, nehmen Sie bitte Kontakt mit uns auf.

    mehr erfahren weniger anzeigen
    Cookies

    Wir verwenden Cookies (technische Cookies und Profilierungs-Cookies von uns und Dritten) auf KFB-acoustics.com, um Ihnen ein besseres Online-Erlebnis zu bieten und Ihnen auf Ihre Präferenzen zugeschnittene Online-Werbebotschaften zukommen zu lassen. Wenn Sie “ Fortfahren“ wählen oder auf einen Inhalt unserer Website zugreifen, ohne Ihre Auswahl anzupassen, stimmen Sie der Verwendung von Cookies zu. Weitere Informationen über unsere Cookie-Politik und wie Sie Cookies ablehnen können, finden Sie hier.

    Fortfahren